Grant and project appraisal
Technical appraisal of EU funding applications (TOP, GINOP, VEKOP).
DetailsType at least two characters. Press Esc to close.
Complex accessibility for nurseries, schools, healthcare, cultural and municipal buildings — from legal compliance to solutions that actually work.
Complex accessibility for public buildings, nurseries, schools, healthcare and municipal buildings, with a rehabilitation environmental design engineering background. 200+ projects (2006–2026).
Accessibility is not a question of ramps. A public building is accessible only if every step works — approach, orientation and use alike — in a wheelchair, with low vision, with a hearing impairment, with a pram or in old age. Complex accessibility means removing physical and information-communication barriers at the same time.
Since 2006 I have taken part in more than 200 rehabilitation and accessibility projects, typically for municipalities and institutions and often as part of grant compliance. The work is underpinned by degrees in rehabilitation engineering and in human and technical rehabilitation consultancy.
Clarifying the function of the institution, its users and the requirements of the grant scheme.
A walk-through along the entire user route, with measurements and photographs.
A compliance matrix: what complies, what does not, and what risk each gap carries.
A phased package of proposals with estimated costs, matched to the available funding.
Design, expert declaration, consultation during the works and handover checks.
That the building is usable for all four main disability groups (mobility, vision, hearing and intellectual impairment): approach, entry, internal circulation, use of rooms and orientation are all provided for — by physical and information-communication means alike.
Usually not. Most calls expect an expert survey and a presentation of the technical content to be delivered. That is why an audit, a deficiency list and — where necessary — a design-level solution are prepared.
Yes, but with compromises. In such cases we look for reversible solutions agreed with the heritage authority that spare the original structure; the aim is the fullest possible access without harming the protected value.
Walking through an average nursery or doctor's surgery takes half a day, and the documentation one to two weeks. For larger institutions with several buildings we work in phases.
Technical appraisal of EU funding applications (TOP, GINOP, VEKOP).
DetailsMandatory corporate energy audits (EA) and building energy certification.
DetailsPreparing official certificates and retrospective permit cases.
DetailsFor a grant application or a refurbishment — tell us what kind of institution is involved.
Follow us:
For a quotation or further information, send us an e-mail or give us a call.